Our Projects
Fit Out
ASOS Head Office
Client
8Build
Location
Scope of Works
Office Fit-out
This is a major fitout project of Greater London House, scheduled to be carried out over an 18 month period. The electrical project includes lighting, lighting control, distribution, small power, UPS supplies and a fire alarm system over 5 floors. It includes 12 number server room installations, a Gym, a Salon and a kitchen, also toilet areas and general office space. Winters were also responsible for the installation of Simmtronic controls, a Notifier alarm system, underfloor electrak and linear lighting. The design also required for the services to remain exposed. Throughout the refurbishment, the building remained occupied and fully operational.